Our Process Overview
Our comprehensive installation process is designed to make the experience of having solar installed on your home, or office, stress-free and exciting. The installation of your solar system will take place in the following four phases. It should be noted that the time it takes to complete each phase of a solar installation varies depending on the size and complexity of the system design.
Phase 1 – Initial System Design And Rebate Paperwork
Perform Site Evaluation
Discuss System Design Options
Sign Installation Agreement
Submit Initial Rebate Reservation Paperwork
Phase 2 – Final System Design And City Permit Application
Submit Application And Design Package For Permit To City
Submit Application And Design Package For Permit To Utility
Phase 3 – Electrical And Mechanical Construction
Installation Of Racking Materials
Installation Of Modules
Run Wiring From Modules To Combiner Boxes Or Inverter
Installation of Inverter
Connect Monitoring System
Submit Proof of Progress Report to Rebate Authorities
Phase 4 – Final Inspections And System Interconnection
Complete Electrical And Mechanical Construction
Receive The Final Building Permit From City Inspectors
Receive Approval To Interconnect From Utility
Submit Final Incentive Claim